Fixes, tested before you see them
On a late job’s page, Takt re-plans and simulates every option against your published schedule before it’s shown. A planner adds one to the draft, with a reason.
TaktAI learns how long work really takes in your shop, then tells you the chance a job ships on time, before you promise it.
Can we ship J26-0373 by Friday?
Yes, on track: an 87% chance of shipping by Friday, Oct 16.
Most likely it ships Wednesday, Oct 14.
It is 95% sure by Monday, Oct 19.
J26-0373: based on 28 past runs · 1,000 simulations
What’s late this week?
One job is likely late this week, and three more are at risk.
Jobs that need attention
| Job | Status | Due |
|---|---|---|
| J26-03903302-118 | Late44% | Oct 15 |
| J26-03885120-034 | At risk58% | Oct 16 |
| J26-03816610-402 | At risk62% | Oct 15 |
| J26-03954410-221 | At risk70% | Oct 16 |
Based on 19 past runs · 1,000 simulations
Can we take 200 more of 7741-220 by Nov 6?
It’s at risk: a 73% chance of shipping 200 more by Nov 6.
Most likely Nov 4, and 95% sure by Nov 10.
The longest wait is OP 30 on 5AX-01, usually about 9 hours.
7741-220: based on 28 past runs · 1,000 simulations
Why is J26-0390 late?
Unlikely: a 44% chance of shipping by Thursday, Oct 15.
OP 10 usually waits about 9 hours for 5AX-01.
5AX-01 has about 61 hours of work due in the 55 hours it runs this shift and the next.
See the options tested for J26-0390
J26-0390: based on 19 past runs · 1,000 simulations
Works with
The problem
The date goes out before anyone knows what the floor can do.
Median of past runs, minutes per part
How it works
Step 1
Jobs, routings, machines and time records from Excel or CSV, or synced from JobBOSS² every hour. You confirm how the columns map; nothing is guessed silently.
Step 2
Setup and run times per part, operation and machine, from your own time records. Missed clock-outs and unattended runs are cleaned out first.
Step 3
Ask about any job, or a new part straight from its drawing. You get the chance it ships on time, the most likely date, the date you can be 95% sure of, and what’s driving the risk.
Product
Schedule board. Every machine’s week: the work due against its hours, and a mark on each job that needs attention. A re-plan drafts changes across the shop, here five that put three jobs back on track. The floor keeps to the published schedule until someone publishes the draft.
Job page. The job’s chance and dates beside its operations: where each runs, when, and where it stands, with what to do next one press away.
Promise check. The chance of shipping by the date asked, how sure each later date is and what drives the risk. Nothing reaches the customer until you commit the date.
Routers
Drop a part’s PDF drawing or a screenshot. Takt finds the callouts; TaktAI works out the stock, operations, machines, and setup and run times. Check a promise date before the quote goes out.
Routers. Takt found five features on this shaft’s drawing, and TaktAI worked out the blank, the operations and their times on the shop’s machines. The slot is drawn as lines, not text, so its size waited for a person to check before the router could be approved and sent to JobBOSS².
Takt
Ask in plain words. Takt answers from your shop’s data, drafts what you’d otherwise type, and tells you when something moves.
On a late job’s page, Takt re-plans and simulates every option against your published schedule before it’s shown. A planner adds one to the draft, with a reason.
Takt writes the update with the forecast’s dates and a reason that’s safe to share. You check it and send it yourself. TaktAI has no way to send it.
Ask about a tap drill, a fit or a finish and Takt answers from general machining knowledge, labelled as such. It never goes into a router, the schedule or a promise unless you type it in yourself.
When a job’s chance moves by more than the noise, Takt says so on Home and on the job’s page, with the cause worked out from your data.
Trust
Takt answers questions and drafts changes. It doesn’t get to make things up, and it doesn’t get the last word.
Why only 87% for J26-0373?
The wait for 5AX-01 is the biggest risk to its date.
OP 30 usually waits about 9 hours for 5AX-01.
5AX-01 has about 61 hours of work due in the 55 hours it runs this shift and the next.
J26-0373: based on 28 past runs · 1,000 simulations
Data tiers
TaktAI works with the data you have today, and its dates tighten as you give it more.
Excel only
Jobs, routings and machines from a spreadsheet. Schedules and promise checks from your routing standards.
Plus time records
Setup and run times learned per part, operation and machine, so dates reflect how your floor really runs.
Plus a live ERP and machine data
Status updates as work happens, with no re-importing, so the board and every promise stay current.
The cards show the same job, J26-0373, at each tier.
Integrations
Running something else? If it exports to Excel or CSV, it works today.
Security
More on our security page and in our privacy notice.
No. Starter works from Excel or CSV exports. If you run JobBOSS², TaktAI can read from it directly.
Jobs, routings and machines. For learned times, also your time records: clock-ins and clock-outs per operation. For routers, a part’s drawing, only if you choose to share it. No CAD files.
No. Takt explains and drafts; every date, chance and time comes from TaktAI’s own models and shows the evidence behind it. Ask a general machining question, like a tap drill size, and the answer is labelled general knowledge, not your shop’s data.
Yes, once your admin turns it on. Drop a PDF drawing or a screenshot and Takt drafts a router: stock, operations, machines and times, each value tied to the drawing. The drawing is kept only if you save it with the router.
No. Takt drafts the message with the forecast’s dates; you edit it and send it from your own email. TaktAI has no way to send it.
You do. Schedules, customer promises, routers and changes to your standards stay drafts until a person approves them.
No. Your ERP stays the system of record. TaktAI reads from it and tells you what’s realistic.
It depends on your shop’s size and data tier. We’ll walk you through it on the demo.
Usually under a week. Most of it is confirming how your columns map to jobs, routings and machines.
No. Your records teach TaktAI your own shop’s times, and nothing else: they are never used to train AI models for anyone, by TaktAI or by the AI providers it uses.
Book a demo
Book a demo and we’ll walk you through TaktAI with a shop like yours.